Showing 1 - 10 of 13
We study an original equipment manufacturer (OEM) purchasing two inputs for assembly from two suppliers with private cost information. The OEM can contract with the two suppliers either simultaneously or sequentially. We consider both cases in which the OEM has relatively equal bargaining power...
Persistent link: https://www.econbiz.de/10012850767
Persistent link: https://www.econbiz.de/10013368300
Persistent link: https://www.econbiz.de/10010206187
Persistent link: https://www.econbiz.de/10009721329
Persistent link: https://www.econbiz.de/10009512325
Persistent link: https://www.econbiz.de/10011446244
Persistent link: https://www.econbiz.de/10012419117
Persistent link: https://www.econbiz.de/10012125891
Persistent link: https://www.econbiz.de/10012815696
Persistent link: https://www.econbiz.de/10014305733