Showing 1 - 4 of 4
Tenix Defence, one of Australia's largest defence contractors, depends on winning bids and managing contracts for long-lifecycle engineering projects. The ability to capture, manage and deliver project knowledge in explicit formats is crucial to its success. Tenix is moving from a paradigm of...
Persistent link: https://www.econbiz.de/10014186056
PLM (Project Lifecycle Management) refers to the computer-aided management of the information life-cycles of complex and costly projects. Things requiring management include definitions of products, their structural subassemblies and components, plus associated technical data, drawings,...
Persistent link: https://www.econbiz.de/10014186195
Complex engineered products are all knowledge intensive. It is crucial for suppliers and operators of such “fleets” of equipment to manage and minimise product costs and risks. Many schedule delays, cost overruns, accidents, excessive operating costs, and premature product failures result...
Persistent link: https://www.econbiz.de/10014186256
This is a three part presentation describing the development of a support engineering knowledge management system for the fleet of 10 ANZAC frigates engineered and constructed by Tenix Defence for the Australian and New Zealand Navies. Part 1 describes the nature of the knowledge that needs to...
Persistent link: https://www.econbiz.de/10014041705