Showing 1 - 4 of 4
Persistent link: https://www.econbiz.de/10010194432
To reduce the order response time or achieve optimal utilization, manufacturers often include an outsourcing alternative in their production plans. Further, undesirable machine breakdowns and nonconforming items produced during the in-house processes must also be effectively managed/corrected to...
Persistent link: https://www.econbiz.de/10012198031
To reduce the order response time or achieve optimal utilization, manufacturers often include an outsourcing alternative in their production plans. Further, undesirable machine breakdowns and nonconforming items produced during the in-house processes must also be effectively managed/corrected to...
Persistent link: https://www.econbiz.de/10012662802
This paper examines a vendor–buyer integrated system that includes rework and an enhanced product delivery policy that aims at lowering stock holding costs for both the vendor and the buyer. It extends the recent work of Chiu et al. (2011) by incorporating an amending ‘n+1’ shipment policy...
Persistent link: https://www.econbiz.de/10010737963