Showing 1 - 10 of 22
Persistent link: https://www.econbiz.de/10009243330
Persistent link: https://www.econbiz.de/10003617141
The classical, deterministic resource-constrained project scheduling problem has been the subject of a great deal of research during the previous decades. This is not surprising given the high practical relevance of this scheduling problem. Nevertheless, extensions are needed to be better able...
Persistent link: https://www.econbiz.de/10012725523
This paper describes new heuristic reactive project scheduling procedures that may be used to repair resource-constrained roject baseline schedules that suer from multiple activity duration disruptions during project execution.The objective is to minimize the deviations between the baseline...
Persistent link: https://www.econbiz.de/10014057657
Persistent link: https://www.econbiz.de/10009511818
Project control has been a research topic since decades that attracts both academics and practitioners. Project control systems indicate the direction of change in preliminary planning variables compared with actual performance. In case their current project performance deviates from the planned...
Persistent link: https://www.econbiz.de/10010931248
Persistent link: https://www.econbiz.de/10010411422
Persistent link: https://www.econbiz.de/10011475721
Persistent link: https://www.econbiz.de/10011593946
Persistent link: https://www.econbiz.de/10012387347