Showing 1 - 3 of 3
Purpose – The purpose of this paper is to identify and assess the extent of occurrence and impact of risk factors responsible for the variation between the forecast and actual construction cash flow. Design/methodology/approach – The study was conducted through a structured questionnaire...
Persistent link: https://www.econbiz.de/10014868851
Purpose – Significant risk factors inherent in construction cost flow forecast were identified in this study. The aim of this paper is to develop regression models to assess the impacts of the identified risks on the baseline forecast at the in‐progress stage of construction....
Persistent link: https://www.econbiz.de/10014868923
Persistent link: https://www.econbiz.de/10015050428