Showing 1 - 6 of 6
This paper deals with multiple due windows assignment scheduling problems and controllable processing times on a single machine. We assume that the actual processing time of a job can be controlled by the introduction of additional resource and any due window is not allowed to contain another...
Persistent link: https://www.econbiz.de/10010869080
Due-window assignment and production scheduling are important issues in operations management. In this study we investigate the problem of common due-window assignment and scheduling of deteriorating jobs and a maintenance activity simultaneously on a single-machine. We assume that the...
Persistent link: https://www.econbiz.de/10010597254
Persistent link: https://www.econbiz.de/10009389093
A single-machine scheduling problem with workload-dependent maintenance duration is considered. The objective is to minimize total completion time. For the case where the derivation of the maintenance duration function is greater than or equal to 1, a polynomial time optimal algorithm is...
Persistent link: https://www.econbiz.de/10011190632
Persistent link: https://www.econbiz.de/10010204622
Persistent link: https://www.econbiz.de/10010485946