Showing 1 - 10 of 26
Persistent link: https://www.econbiz.de/10009153813
Persistent link: https://www.econbiz.de/10009243355
Persistent link: https://www.econbiz.de/10009526852
Persistent link: https://www.econbiz.de/10012887467
Persistent link: https://www.econbiz.de/10015134996
Persistent link: https://www.econbiz.de/10009664181
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of...
Persistent link: https://www.econbiz.de/10009758825
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is...
Persistent link: https://www.econbiz.de/10009758826
Persistent link: https://www.econbiz.de/10010424867
Persistent link: https://www.econbiz.de/10008759776