Showing 1 - 10 of 25
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10003711685
Persistent link: https://www.econbiz.de/10001379220
Persistent link: https://www.econbiz.de/10002856210
Persistent link: https://www.econbiz.de/10003375598
Flow line design is one of the major tasks in production management. The decision to install a set of machines and buffers is often highly irreversible. It determines both cost and revenue to a large extent. In order to assess the economic impact of any possible flow line design, production...
Persistent link: https://www.econbiz.de/10013519171
Persistent link: https://www.econbiz.de/10003935919
Persistent link: https://www.econbiz.de/10009738972
We present a detailed analysis of the patient and resource scheduling problem in rehabilitation hospitals. In practice, the predominantly therapeutical treatments and activities which are prescribed for the patients are typically scheduled manually. This leads to rigid and inefficient schedules...
Persistent link: https://www.econbiz.de/10008906834
Persistent link: https://www.econbiz.de/10003511840
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10010531358