//--> //--> //--> //-->
Toggle navigation
Logout
Change account settings
EN
DE
ES
FR
A-Z
Beta
About EconBiz
News
Thesaurus (STW)
Academic Skills
Help
EN
DE
ES
FR
My account
Logout
Change account settings
Login
Publications
Events
Your search terms
Search
Retain my current filters
~subject:"Scheduling problem"
Search options
All Fields
Title
Exact title
Subject
Author
Institution
ISBN/ISSN
Published in...
Publisher
Open Access only
Advanced
Search history
My EconBiz
Favorites
Loans
Reservations
Fines
You are here:
Home
Solution algorithms for dynami...
Similar by person
Narrow search
Delete all filters
| 1 applied filter
Year of publication
From:
To:
Subject
All
Scheduling problem
Heuristics
16
Heuristik
16
Scheduling-Verfahren
15
Theorie
14
Theory
14
Algorithm
13
Algorithmus
13
Betriebliche Kreislaufwirtschaft
6
Mathematical programming
6
Mathematische Optimierung
6
Reverse logistics
6
heuristics
6
Korea <Süd>
5
Production control
5
Produktionssteuerung
5
South Korea
4
Südkorea
4
Assembly-line production
3
Durchlaufzeit
3
Fließfertigung
3
Lead time
3
scheduling
3
selective disassembly sequencing
3
Außenhandel
2
Außenhandel mit Industriegütern
2
Branch and Bound
2
Branch-and-Bound
2
Business process management
2
Elektronikindustrie
2
Emissions trading
2
Emissionshandel
2
Familie
2
Family
2
Flexible manufacturing system
2
Flexibles Fertigungssystem
2
Foreign trade
2
Greenhouse gas emissions
2
Hafen
2
Hafenwirtschaft
2
more ...
less ...
Online availability
All
Undetermined
6
Type of publication
All
Article
15
Type of publication (narrower categories)
All
Article in journal
15
Aufsatz in Zeitschrift
15
Language
All
English
15
Author
All
Lee, Dong-ho
10
Kim, Ji-su
4
Yu, Jae-min
4
Kim, Hyung-Won
3
Lee, Dong-Ho
3
Yu, Jae-Min
3
Kim, Hwa-joong
2
Kim, Hyeon-Il
2
Doh, Hyoung-Ho
1
Doh, Hyoung-ho
1
Go, Hun
1
Han, Hee-jong
1
Huang, Rong
1
Kim, Jae-gon
1
Kim, Jun-gyu
1
Kim, Min-geun
1
Kim, Seung-kil
1
Nam, Sung-ho
1
Park, Chuljin
1
Shin, Jeong-Hoon
1
Xirouchakis, Paul
1
Youn, Ae-Jin
1
more ...
less ...
Published in...
All
International journal of production research
13
European journal of industrial engineering : EJIE
1
European journal of operational research : EJOR
1
Source
All
ECONIS (ZBW)
15
Showing
1
-
10
of
15
Sort
relevance
articles prioritized
date (newest first)
date (oldest first)
1
Operation and preventive maintenance scheduling for containerships : mathematical model and solution algorithm
Go, Hun
;
Kim, Ji-su
;
Lee, Dong-ho
- In:
European journal of operational research : EJOR
229
(
2013
)
3
,
pp. 626-636
Persistent link: https://www.econbiz.de/10009764311
Saved in:
2
Fast and meta-heuristics for common due-date assignment and scheduling on parallel machines
Kim, Jun-gyu
;
Kim, Ji-su
;
Lee, Dong-ho
- In:
International journal of production research
50
(
2012
)
20
,
pp. 6040-6057
Persistent link: https://www.econbiz.de/10009670287
Saved in:
3
Scheduling algorithms to minimise to total family flow time for job shops with job families
Yu, Jae-min
;
Kim, Ji-su
;
Lee, Dong-ho
- In:
International journal of production research
49
(
2011
)
22/24
,
pp. 6885-6903
Persistent link: https://www.econbiz.de/10009671034
Saved in:
4
Scheduling algorithms for remanufacturing systems with parallel flow-shop-type reprocessing lines
Kim, Min-geun
;
Yu, Jae-min
;
Lee, Dong-ho
- In:
International journal of production research
53
(
2015
)
6
,
pp. 1819-1831
Persistent link: https://www.econbiz.de/10010500732
Saved in:
5
Selective disassembly sequencing with random operation times in parallel disassembly environment
Kim, Hyung-Won
;
Park, Chuljin
;
Lee, Dong-ho
- In:
International journal of production research
56
(
2018
)
24
,
pp. 7243-7257
Persistent link: https://www.econbiz.de/10011986937
Saved in:
6
Solution algorithms to minimise the total family tardiness for job shop scheduling with job families
Yu, Jae-Min
;
Lee, Dong-ho
- In:
European journal of industrial engineering : EJIE
12
(
2018
)
1
,
pp. 1-23
Persistent link: https://www.econbiz.de/10011897432
Saved in:
7
Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops
Yu, Jae-Min
;
Huang, Rong
;
Lee, Dong-ho
- In:
International journal of production research
55
(
2017
)
11/12
,
pp. 3266-3282
Persistent link: https://www.econbiz.de/10011655193
Saved in:
8
An optimal algorithm for selective disassembly sequencing with sequence-dependent set-ups in parallel disassembly environment
Kim, Hyung-Won
;
Lee, Dong-ho
- In:
International journal of production research
55
(
2017
)
24
,
pp. 7317-7333
Persistent link: https://www.econbiz.de/10011798598
Saved in:
9
Simulaneous order-lot pegging and wafer release planning for semiconductor wafer fabrication facilities
Kim, Seung-kil
;
Kim, Jae-gon
;
Kim, Hwa-joong
- In:
International journal of production research
52
(
2014
)
12
,
pp. 3710-3724
Persistent link: https://www.econbiz.de/10010356948
Saved in:
10
Capacitated disassembly scheduling with random demand
Kim, Hwa-joong
;
Xirouchakis, Paul
- In:
International journal of production research
48
(
2010
)
23/24
,
pp. 7177-7194
Persistent link: https://www.econbiz.de/10008758872
Saved in:
1
2
Next
Last
Results per page
10
25
50
100
250
A service of the
zbw
×
Loading...
//-->