This contribution presents an efficient solution method for solving the major short-term planning problems which occur, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling. Since both problems heavily interact, we propose an...
Persistent link: https://www.econbiz.de/10011737361
While balancing straight assembly lines is a well-studied problem, the Situation where the assembly line has a U-shaped Iayout is a still emerging research field. The advantage of these lines is that workers may simply turn around to operate at two legs of the line. Hence, there is an additional...
Persistent link: https://www.econbiz.de/10011734653
Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances. Thus, heuristics have become a popular research field. Up to now, however, tight...
Persistent link: https://www.econbiz.de/10011734980
Persistent link: https://www.econbiz.de/10011735696
This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.