Showing 1 - 10 of 3,159
In this paper, we treat an optimal control problem of a stochastic two-machine flowshop with machines subject to random breakdown and repair. While the problem is difficult to solve, it can be approximated by a deterministic problem when the rates of machine failure and repair become large....
Persistent link: https://www.econbiz.de/10014046911
We consider the assignment of jobs to agents in a stochastic and dynamic setting. Focus is on a dynamic scenario with due dates and service levels reflecting the completion of jobs within certain deadlines. Due dates and other relevant characteristics for currently uncompleted jobs generated in...
Persistent link: https://www.econbiz.de/10012988403
We address the scheduling problem of reordering an existing queue into its efficient order through trade. To that end, we consider individually rational and balanced budget direct and indirect mechanisms. We show that this class of mechanisms allows us to form efficient queues provided that...
Persistent link: https://www.econbiz.de/10010365886
We address the scheduling problem of reordering an existing queue into its efficient order through trade. To that end, we consider individually rational and balanced budget direct and indirect mechanisms. We show that this class of mechanisms allows us to form efficient queues provided that...
Persistent link: https://www.econbiz.de/10012720655
-lags, where the time-lags have a chain form, and propose a polynomial algorithm to solve it. The algorithm consist in a polynomial …
Persistent link: https://www.econbiz.de/10014046304
This paper presents an asymptotic analysis of hierarchical production planning in a manufacturing system with two tandem machines that are subject to breakdown and repair. The system produces a single product, whose rate of demand over time is given to be constant. The problem is formulated as a...
Persistent link: https://www.econbiz.de/10014046910
We have developed a non-linear multi-objective model for optimal design of railway timetables. The objectives of the model are to maximize schedule reliability and minimize energy consumption, rolling stock and crew deployment. Metrics have been derived for each of these objectives. AHP is used...
Persistent link: https://www.econbiz.de/10014153838
limitations or in reasonable time. We propose an Ant Colony-based algorithm (TrACA) that produces optimal or near-optimal results … state-of-the-art memetic algorithm (MA). Results indicate that in a given run-time, the median of results from TrACA …
Persistent link: https://www.econbiz.de/10012915046
Combinatorial optimization problems are usually NP-hard and the solution space of them is very large. Therefore the set of feasible solutions cannot be evaluated one by one. Artificial Bee Colony (ABC), Particle Swarm Optimization (PSO) and Genetic Algorithms (GA) are metaheuristic techniques...
Persistent link: https://www.econbiz.de/10013060468
This paper presents an asymptotic analysis of hierarchical production planning in a manufacturing system with two tandem machines that are subject to breakdown and repair. Since the number of parts in the buffer between the two machines needs to be non-negative, the problem is inherently a state...
Persistent link: https://www.econbiz.de/10012835287