Showing 1 - 10 of 37
Persistent link: https://www.econbiz.de/10003222902
Persistent link: https://www.econbiz.de/10001701435
Persistent link: https://www.econbiz.de/10001702056
Persistent link: https://www.econbiz.de/10001990017
Persistent link: https://www.econbiz.de/10001861892
Persistent link: https://www.econbiz.de/10001874326
Persistent link: https://www.econbiz.de/10002239992
In this paper we present a method to construct a periodic timetable from a tacticalplanning perspective. We aim at constructing a timetable that is feasible with respectto infrastructure constraints and minimizes average perceived passenger travel time. Inaddition to in-train and transfer times,...
Persistent link: https://www.econbiz.de/10013227701
In this paper we introduce the problem of shunting passenger trainunits in a railway station. Shunting occurs whenever train units aretemporarily not necessary to operate a given timetable. We discussseveral aspects of this problem and focus on two subproblems. Wepropose mathematical models for...
Persistent link: https://www.econbiz.de/10014031459
Persistent link: https://www.econbiz.de/10003985036