Showing 1 - 10 of 273
Persistent link: https://www.econbiz.de/10009679281
Persistent link: https://www.econbiz.de/10011628297
Persistent link: https://www.econbiz.de/10014328001
Persistent link: https://www.econbiz.de/10001303156
Persistent link: https://www.econbiz.de/10001571655
Combinatorial auctions are increasingly being used to allocate bundles of items among interested bidders. However, as the number of bundles increases, it takes exponentially longer to solve for the winners in the auction. In such situations, regular solvers such as IBM CPLEX or AMPL fail to...
Persistent link: https://www.econbiz.de/10012915046
Persistent link: https://www.econbiz.de/10013550176
The smart workshop is a powerful tool for manufacturing companies to reduce waste and improve production efficiency through real-time data analysis for self-organized production. Automated Guided Vehicles (AGVs) have been widely used for material handling in smart workshop due to their high...
Persistent link: https://www.econbiz.de/10014360266
The problem of scheduling jobs on parallel machines (identical, uniform, or unrelated), under incompatibility relation modeled as a block graph, under the makespan optimality criterion, is considered in this paper. No two jobs that are in the relation (equivalently in the same block) may be...
Persistent link: https://www.econbiz.de/10014360669