Showing 1 - 10 of 10
Persistent link: https://www.econbiz.de/10013282396
Persistent link: https://www.econbiz.de/10010222106
Persistent link: https://www.econbiz.de/10009689277
Persistent link: https://www.econbiz.de/10011543732
Persistent link: https://www.econbiz.de/10011428999
Persistent link: https://www.econbiz.de/10012484637
Persistent link: https://www.econbiz.de/10013375310
We present a two-stage scheduling approach including proactive and reactive scheduling to solve the ground resource scheduling problem with uncertain arrival time. In the first stage, an integer programming model is constructed to minimize the delay and transfer costs. After solving this model,...
Persistent link: https://www.econbiz.de/10014448622
Persistent link: https://www.econbiz.de/10015338211
The optimal production control problem of deterministic pull flow lines with multiple part types is considered in this paper. The last machine is assumed to be the bottleneck. The objective is to minimize the total inventory and backlog costs over time. We give an optimal production policy and...
Persistent link: https://www.econbiz.de/10012835295