Showing 1 - 10 of 51
Persistent link: https://www.econbiz.de/10001497145
Persistent link: https://www.econbiz.de/10011697092
A single-machine multiproduct manufacturing system with random breakdowns and random repair times is considered. Under a weak capacity condition on the system it is shown that the total work-in-progress (WIP) is a recurrent stochastic process. By replacing the stochastic model by a deterministic...
Persistent link: https://www.econbiz.de/10012746440
In this paper, we consider a production planning problem in a two-machine flowshop subject to breakdown and repair of machines and subject to non-negativity constraints on work-in-process. The machine capacities and demand processes are assumed to be finite state Markov chains. The problem is to...
Persistent link: https://www.econbiz.de/10012746441
This note formulates an assignment problem for obtaining optimal level schedules for mixed-model assembly lines in JIT production systems. The problem was formulated as a quadratic integer programming problem in a recent paper by Miltenburg (1989) where, however, only enumerative algorithms and...
Persistent link: https://www.econbiz.de/10012746783
A heuristic procedure is developed for minimizing makespan in flow-shop scheduling problems. In comparison with current algorithms, our algorithm seems to result in an improved makespan with a small additional computational effort. An algorithm is also developed to minimize the required number...
Persistent link: https://www.econbiz.de/10012746785
A companion paper (Part I) considers the problem of minimizing the weighted earliness and tardiness of jobs scheduled on a single machine around a common due date, d, which is unrestrictively late. This paper (Part II) considers the problem of minimizing the unweighted earliness and tardiness of...
Persistent link: https://www.econbiz.de/10012746786
We study the recently identified class of generalized due date scheduling problems. These are machine scheduling problems for which due dates are specified according to the position in which a job is completed, rather than the identity of that job. Flexible manufacturing environments and public...
Persistent link: https://www.econbiz.de/10012746788
We study the problem of minimizing makespan in a two-machine job shop with unit processing time operations. An efficient algorithm with respect to a succinct encoding of the problem instances is proposed. The algorithm is an improvement of earlier algorithms proposed for the problem by Brucker [...
Persistent link: https://www.econbiz.de/10012746789
A single machine processing different types of parts is considered. Switching from one type to another involves a setup time. The part types may have different processing times. The resulting scheduling problem is treated as a dynamical system for which several feedback policies that are...
Persistent link: https://www.econbiz.de/10012746791