Ying, Kuo-Ching; Pourhejazy, Pourya; Lin, Zhi-Rong - In: Operations research perspectives 14 (2025), pp. 1-17
The role of setup times in production planning and control was recognised in the late 1960s. Since then, a growing number of scheduling problems have accounted for sequence-dependent setup time variables. This study aims to provide a systematic review of setup times in the short-term production...