Showing 1 - 10 of 387
Persistent link: https://www.econbiz.de/10011617681
on throughput and work‐in‐process inventory of flow lines. This paper seeks to extend the basic dice game along the … experience is the understanding of the relationship between variability and throughput in an environment with dependent …
Persistent link: https://www.econbiz.de/10014790218
Traditionally, assembly lines are laid out in a straight-line configuration where a worker covers only adjacent stations. In a U-line layout, on the other hand, two or more non-adjacent stations can be physically close to each other, making it possible for a worker to cover nonadjacent stations....
Persistent link: https://www.econbiz.de/10009218761
Persistent link: https://www.econbiz.de/10014381851
Persistent link: https://www.econbiz.de/10010219772
Persistent link: https://www.econbiz.de/10009621286
Persistent link: https://www.econbiz.de/10011498217
production rate (Throughput). The case study involves unreliable operating conditions. Process times, and timeframes between …
Persistent link: https://www.econbiz.de/10015066178
Persistent link: https://www.econbiz.de/10012614606
Persistent link: https://www.econbiz.de/10012519436