Showing 1 - 10 of 32
Persistent link: https://www.econbiz.de/10001497145
We consider a production planning problem in a two-machine flowshop subject to breakdown and repair of machines and subject to nonnegativity and upper bound constraints on work-in-process. The objective is to choose machine production rates over time to minimize the long-run average...
Persistent link: https://www.econbiz.de/10014218557
Persistent link: https://www.econbiz.de/10002051921
Persistent link: https://www.econbiz.de/10001692168
Persistent link: https://www.econbiz.de/10009299847
Persistent link: https://www.econbiz.de/10011773297
Persistent link: https://www.econbiz.de/10011757575
Persistent link: https://www.econbiz.de/10011673145
We consider a single-product, two-source inventory system with Poisson demand and backlogging. Inventory can be replenished through a normal supply source, which consists of a two-stage tandem queue with exponential production time at each stage. We can also place an emergency order by skipping...
Persistent link: https://www.econbiz.de/10012993864
Persistent link: https://www.econbiz.de/10013366472