Showing 1 - 10 of 12
This paper considers an infinite horizon stochastic production planning problem with the constraint that production rate must be nonnegative. It is shown that an optimal feedback solution exists for the problem. Moreover, this solution is characterized and is then compared with the solution of...
Persistent link: https://www.econbiz.de/10012746449
Persistent link: https://www.econbiz.de/10014098097
Persistent link: https://www.econbiz.de/10001497145
Persistent link: https://www.econbiz.de/10002051921
Persistent link: https://www.econbiz.de/10003898868
Persistent link: https://www.econbiz.de/10003984231
Persistent link: https://www.econbiz.de/10003600517
Information delays exist in an inventory system when it takes time to collect, process, validate, and transmit inventory/demand data. A general framework is developed in this paper to describe information flows in an inventory system with information delays. We characterize the suffcient...
Persistent link: https://www.econbiz.de/10014219970
Persistent link: https://www.econbiz.de/10014265975
Persistent link: https://www.econbiz.de/10014265980