Showing 1 - 10 of 18
Persistent link: https://www.econbiz.de/10001497145
We consider an N-machine flowshop with unreliable machines and bounds on work-in-process. Machine capacities and demand processes are finite-state Markov chains. The problem is to choose the rates of production on the machines over time to minimize the expected discounted costs of production and...
Persistent link: https://www.econbiz.de/10014046913
This paper is concerned with the problem of production planning in a stochastic manufacturing system with serial machines that are subject to breakdown and repair. The machine capacities are modeled by a Markov chain. The objective is to choose the input rates at the various machines over time...
Persistent link: https://www.econbiz.de/10014047578
This paper is concerned with the problem of production planning in a stochastic manufacturing system with serial machines that are subject to breakdown and repair. The machine capacities are modeled as Markov chains. Since the number of parts in the internal buffers between any two the problem...
Persistent link: https://www.econbiz.de/10014047579
We consider a production planning problem in a two-machine flowshop subject to breakdown and repair of machines and subject to nonnegativity and upper bound constraints on work-in-process. The objective is to choose machine production rates over time to minimize the long-run average...
Persistent link: https://www.econbiz.de/10014218557
We consider a production planning problem for a general jobshop producing a number of products and subject to breakdown and repair of machines. The machine capacities are modeled as Markov chains. The objective is to choose the rates of production of the final products and intermediate parts on...
Persistent link: https://www.econbiz.de/10014098593
We consider a production planning problem in an N-machine flowshop subject to breakdown and repair of machines and to non-negativity constraints on work-in process. The machine capacities and demand processes are assumed to be finite-state Markov chains. The problem is to choose the rates of...
Persistent link: https://www.econbiz.de/10012835291
We consider a production planning problem for a general jobshop subject to breakdown and repair of machines and subject to lower and upper bound constraints on work-in-process. The machine capacities and demand processes are assumed to be finite state Markov chains. The problem is to choose the...
Persistent link: https://www.econbiz.de/10014211280
Persistent link: https://www.econbiz.de/10003108167
Persistent link: https://www.econbiz.de/10002051921