Showing 1 - 10 of 12
Infrastructure-planning models are challenging because of their combination of different time scales: while planning and building the infrastructure involves strategic decisions with time horizons of many years, one needs an operational time scale to get a proper picture of the...
Persistent link: https://www.econbiz.de/10010846147
We present a modeling framework for analyzing if the use of interruptible transportation services can improve capacity utilization in a natural gas transportation network. The network consists of two decision makers: the transmission system operator (TSO) and a shipper of natural gas. The TSO is...
Persistent link: https://www.econbiz.de/10011209405
Persistent link: https://www.econbiz.de/10010509998
Persistent link: https://www.econbiz.de/10010437136
Persistent link: https://www.econbiz.de/10012615147
Persistent link: https://www.econbiz.de/10014636794
Persistent link: https://www.econbiz.de/10012239650
Persistent link: https://www.econbiz.de/10005369519
This paper presents a new heuristic for generating scenarios for two-stage stochastic programs. The method uses copulas to describe the dependence between the marginal distributions, instead of the more common correlations. The heuristic is then tested on a simple portfolio-selection model, and...
Persistent link: https://www.econbiz.de/10010949669
Persistent link: https://www.econbiz.de/10008925145