Showing 1 - 10 of 12
The development of toll road investment in Indonesia from the year 1978 until 2008 still slowed down. Before financial crisis, before 1998, the total length of toll road in Indonesia was 532.62 km. At the same time, compared to other nations in East Asian, such as China the total length of toll...
Persistent link: https://www.econbiz.de/10014046451
The length of toll road in China so fantastic, there are currently 53,600 km of toll road traversing the country – the second longest in the world behind the United States, which has 89,000 km. And China plans to have 85,000 km of toll road by 2020. Meanwhile, in East Asia including Indonesia,...
Persistent link: https://www.econbiz.de/10014205508
The development of toll road infrastructure in developing countries included Indonesia still slow down. There are many problems to build toll road infrastructure, one of them is financing. The need of toll road infrastructure investment in Indonesia is Rp66,751.95 Billions to build 768.65 km of...
Persistent link: https://www.econbiz.de/10013037343
In a build, operate, and transfer (BOT) scheme, as Project Finance (PF), equity investors are concerned about the adequacy of their returns. On the other hand, the timeliness of the project debt service payments focuses to the lenders. Consequently, an important role is played by PF and risk...
Persistent link: https://www.econbiz.de/10012888820
In greenfield toll-road projects, financial sustainability has been a major issue. Many toll roads cannot be operated. Although most of Indonesia's 24 toll road concessions have already been signed by the Toll Road Authority, most of them were caused by financing problems. Three problems have...
Persistent link: https://www.econbiz.de/10012888918
The development of toll road investment in Indonesia from the year 1978 until 2008 still slowed down. Before financial crisis, before 1998, the total length of toll road in Indonesia was 532.62 km. At the same time, compared to other nations in East Asian, such as China the total length of toll...
Persistent link: https://www.econbiz.de/10013158726
The development of toll road investment in Indonesia from the year 1978 until 2008 still slowed down. Before financial crisis, before 1998, the total length of toll road in Indonesia was 532.62 km. At the same time, compared to other nations in East Asian, such as China the total length of toll...
Persistent link: https://www.econbiz.de/10013158951
The development of toll road infrastructure in Indonesia is still slow down, if we compare the growth of toll road before crisis from 1978 until 1998 was 13.66% and after the crisis from 1999 to 2010 was 2.14%. Otherwise, the length of toll road in Indonesia until now has 742 km, operated by...
Persistent link: https://www.econbiz.de/10013112467
The development of toll road infrastructure in Indonesia is very decelerate where from 1500 km that was planned in 2006, but the realization is only 749,12 km operation in 2010, meanwhile the land that will be acquisited in Trans Java toll road is 6,272.84 Ha, but only 1,400 Ha have been...
Persistent link: https://www.econbiz.de/10014192773
The development of toll road in developing countries especially in Indonesia was very slow. Although the Government of Indonesia has an accelerated toll road plan for 2020 was 4,000 km, but toll road length in 2013 was still 784 km. Because of that, the gap of toll road length in Indonesia has...
Persistent link: https://www.econbiz.de/10012870655