Showing 1 - 10 of 13,863
Production planning and control in remanufacturing are more complex than those in traditional manufacturing. Developing a reliable forecasting process is the first step for optimization of the overall planning process. In remanufacturing, forecasting the timing of demands is one of the critical...
Persistent link: https://www.econbiz.de/10011570146
Persistent link: https://www.econbiz.de/10010387735
Persistent link: https://www.econbiz.de/10010254386
Persistent link: https://www.econbiz.de/10009566471
Persistent link: https://www.econbiz.de/10011630999
Persistent link: https://www.econbiz.de/10003751289
Persistent link: https://www.econbiz.de/10000992357
Persistent link: https://www.econbiz.de/10001215423
Persistent link: https://www.econbiz.de/10001137141
We propose an analytical framework based on the Kalman Filter to quantify central distortionary effects of product-specific subsidies. In our application, we use time series of foreign and domestic order book levels during and after the temporary installation of a "cash for clunkers" subsidy by...
Persistent link: https://www.econbiz.de/10011809947