Two classes of one machine sequencing situations are considered in which each job corresponds to exactly one player but a player may have more than one job to be processed, so called RP(repeated player) sequencing situations.In max-RP sequencing situations it is assumed that each player's cost...
Persistent link: https://www.econbiz.de/10011090690
In this paper we study the relation between convexity of TU games and marginal vectors.We show that if specfic marginal vectors are core elements, then the game is convex.We characterize sets of marginal vectors satisfying this property, and we derive the formula for the minimum number of...
Persistent link: https://www.econbiz.de/10011091198
In this paper we construct sets of marginal vectors of a TU game with the property that if the marginal vectors from these sets are core elements, then the game is convex.This approach leads to new upperbounds on the number of marginal vectors needed to characterize convexity.An other result is...
Persistent link: https://www.econbiz.de/10011091846
This paper studies situations in which a project consisting of several activities is not executed as planned.It is divided into three parts.The first part analyzes the case where the activities may be delayed; this possibly induces a delay on the project as a whole with additional costs.Associated...
Persistent link: https://www.econbiz.de/10011091937
In a proportionate flow shop problem several jobs have to be processed through a fixed sequence of machines and the processing time of each job is equal on all machines.By identifying jobs with agents, whose costs linearly depend on the completion time of their jobs, and assuming an initial...