Showing 1 - 2 of 2
This paper presents a dynamic programming algorithm for simultaneous determination of production batch sizes in an assembly network and distribution batch sizes in a conjoined distribution ("arborescent") network. The objective is to minimize average cost per period over an infinite horizon....
Persistent link: https://www.econbiz.de/10009203889
The multi-item joint replenishment problem is generalized to allow ordering costs to be dependent on the specific items jointly supplied. A fixed cycle approach is examined in which all the items of a group are always jointly replenished. A dynamic programming algorithm is developed for...
Persistent link: https://www.econbiz.de/10009214860