Showing 1 - 1 of 1
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the...
Persistent link: https://www.econbiz.de/10011938903