Showing 1 - 3 of 3
In this research, a permutation flowshop sequence-dependent group scheduling problem with minimisation of total completion time is considered. Since the problem is shown to be strongly NP-hard, a hybrid genetic (HG) algorithm is proposed. The only available lower bounding (LB) method for the...
Persistent link: https://www.econbiz.de/10010777251
Persistent link: https://www.econbiz.de/10010202712
Persistent link: https://www.econbiz.de/10011691477