Showing 1 - 3 of 3
Unit root tests for time series with level shifts are considered. The level shift is assumed to occur at a known time point. In contrast to some other proposals the level shift is modeled as part of the intercept term of the stationary component of the data generation process which is separated...
Persistent link: https://www.econbiz.de/10010309977
Unit root tests for time series with level shifts are considered. The level shift is assumed to occur at a known time point. In contrast to some other proposals the level shift is modeled as part of the intercept term of the stationary component of the data generation process which is separated...
Persistent link: https://www.econbiz.de/10010983628
Unit root tests for time series with level shifts of general form are considered when the timing of the shift is unknown. It is proposed to estimate the nuisance parameters of the data generation process including the shift date in a first step and apply standard unit root tests to the...
Persistent link: https://www.econbiz.de/10010983820