Showing 1 - 10 of 210
Persistent link: https://www.econbiz.de/10007753027
Persistent link: https://www.econbiz.de/10009978738
Persistent link: https://www.econbiz.de/10006641499
Persistent link: https://www.econbiz.de/10006651489
We consider the NP-hard problem of scheduling n jobs in m two-stage parallel flow shops so as to minimize the makespan. This problem decomposes into two subproblems: assigning the jobs to parallel flow shops; and scheduling the jobs assigned to the same flow shop by use of Johnson’s rule. For...
Persistent link: https://www.econbiz.de/10010577572
We analyze the performance of the greedy algorithm for the on-line two-machine open shop scheduling problem of minimizing makespan, in which time lags exist between the completion time of the first and the start time of the second operation of any job. The competitive ratio for the greedy...
Persistent link: https://www.econbiz.de/10008483305
Persistent link: https://www.econbiz.de/10005151622
Persistent link: https://www.econbiz.de/10005283682
Persistent link: https://www.econbiz.de/10009818461
Persistent link: https://www.econbiz.de/10008845019