Showing 1 - 10 of 351
Persistent link: https://www.econbiz.de/10001129134
We consider a single machine, multiproduct manufacturing system, which can operate at finitely many quality levels. The quality of the machine deteriorates according to a continuous-time Markov process and the only way to improve the quality is by replacing the machine by a new one. In this...
Persistent link: https://www.econbiz.de/10012751058
We derive a sharp upper bound on the minimal forecast horizon in the discounted dynamic lot size model with constant initial demand. This bound is given by m(m 1), where m is the EOQ's worth, i.e., the number of periods for which the total demand equals Economic Order Quantity. Our results do...
Persistent link: https://www.econbiz.de/10012706709
Persistent link: https://www.econbiz.de/10006064046
Persistent link: https://www.econbiz.de/10006068478
Persistent link: https://www.econbiz.de/10001497101
Persistent link: https://www.econbiz.de/10001440334
Persistent link: https://www.econbiz.de/10001423750
Persistent link: https://www.econbiz.de/10001470056
Persistent link: https://www.econbiz.de/10001470295