Fondrevelle, J.; Oulamara, A.; Portmann, M.-C. - In: International Journal of Production Economics 112 (2008) 1, pp. 168-176
In this article, we consider flowshop scheduling problems with minimal and maximal time lag constraints. Such constraints extend precedence constraints between operations in the jobs and may be used to model various industrial applications. The objective is to minimize a non-classical criterion...