Showing 1 - 10 of 66
We present a modeling framework for analyzing if the use of interruptible transportation services can improve capacity utilization in a natural gas transportation network. The network consists of two decision makers: the transmission system operator (TSO) and a shipper of natural gas. The TSO is...
Persistent link: https://www.econbiz.de/10011209405
Persistent link: https://www.econbiz.de/10008314715
Persistent link: https://www.econbiz.de/10008651657
Persistent link: https://www.econbiz.de/10003894343
Persistent link: https://www.econbiz.de/10010251203
Persistent link: https://www.econbiz.de/10010509998
In the deregulated Norwegian electricity market a zonal transmission pricing system is used to cope with network capacity problems. In this paper we illustrate some of the problems with the zonal pricing system as it is implemented in Norway. Using small network examples we illustrate the...
Persistent link: https://www.econbiz.de/10004986863
Persistent link: https://www.econbiz.de/10005179853
Persistent link: https://www.econbiz.de/10009885623
Persistent link: https://www.econbiz.de/10003856836