Showing 1 - 10 of 27,419
We establish the computational complexity of the problem of minimizing makespan in a flowshop, where each jobs requires a pallet the entire time, from the start of its first operation until the completion of the last operation. We prove that the problem is NP-hard in the strong sense for m =2...
Persistent link: https://www.econbiz.de/10013152472
Persistent link: https://www.econbiz.de/10010257368
Persistent link: https://www.econbiz.de/10010491516
Persistent link: https://www.econbiz.de/10003767328
Persistent link: https://www.econbiz.de/10003758231
Persistent link: https://www.econbiz.de/10011645248
Persistent link: https://www.econbiz.de/10012243866
Persistent link: https://www.econbiz.de/10012233461
Persistent link: https://www.econbiz.de/10014547208
Persistent link: https://www.econbiz.de/10014547429