Showing 1 - 10 of 51
In this paper we study a single stage, periodic-review inventory problem for a single item with stochastic demand. The inventory manager determines order sizes according to an order-up-to logic and observes a random yield due to quality problems in the production. We distinguish between two...
Persistent link: https://www.econbiz.de/10011052689
Persistent link: https://www.econbiz.de/10009732706
In this paper the repair kit problem is studied, where technicians have to visit several customers to repair broken appliances (such as copiers or heating systems) and they can only take a limited set of parts with them (called the repair kit). In this problem, it has to be decided which spare...
Persistent link: https://www.econbiz.de/10015193953
In this paper we study the problem of determining a production schedule for an order of n jobs on a single machine which is subject to stochastic machine failures. To avoid long downtime of the machine caused by unexpected failures, preventive maintenance should be planned as well. If a failure...
Persistent link: https://www.econbiz.de/10010468212
In this paper, we consider a serial two-echelon periodic review inventory system with two supply modes at the most upstream stock point. As control policy for this system, we propose a natural extension of the dual-index policy, which has three base-stock levels. We consider the minimization of...
Persistent link: https://www.econbiz.de/10011052479
Persistent link: https://www.econbiz.de/10006652251
Persistent link: https://www.econbiz.de/10006816061
Persistent link: https://www.econbiz.de/10006276048
In this paper we study the problem of determining a production schedule for an order of n jobs on a single machine which is subject to stochastic machine failures. To avoid long downtime of the machine caused by unexpected failures, preventive maintenance should be planned as well. If a failure...
Persistent link: https://www.econbiz.de/10011144578
We derive a closed-form cost expression for an (R,s,nQ) inventory control policy where all replenishment orders have a constant lead-time, unfilled demand is backlogged and inter-arrival times of order requests are generalized Erlang distributed
Persistent link: https://www.econbiz.de/10005802223