Showing 1 - 10 of 52
Persistent link: https://www.econbiz.de/10010259826
Persistent link: https://www.econbiz.de/10011514811
This study employs an alternative approach to determine common production cycle time for a multi-item production system with discontinuous deliveries and failure in rework. A straightforward approach using algebraic derivation is proposed here to reexamine a specific common cycle time problem...
Persistent link: https://www.econbiz.de/10010719390
Persistent link: https://www.econbiz.de/10012258087
Persistent link: https://www.econbiz.de/10015395514
Persistent link: https://www.econbiz.de/10013178129
Persistent link: https://www.econbiz.de/10013391036
Persistent link: https://www.econbiz.de/10003922913
Persistent link: https://www.econbiz.de/10010194432
To reduce the order response time or achieve optimal utilization, manufacturers often include an outsourcing alternative in their production plans. Further, undesirable machine breakdowns and nonconforming items produced during the in-house processes must also be effectively managed/corrected to...
Persistent link: https://www.econbiz.de/10012198031