Showing 41 - 50 of 282
Persistent link: https://www.econbiz.de/10003089501
Persistent link: https://www.econbiz.de/10003089699
Persistent link: https://www.econbiz.de/10003089811
Persistent link: https://www.econbiz.de/10003089863
Persistent link: https://www.econbiz.de/10002717714
Persistent link: https://www.econbiz.de/10002717754
Recently, time-switch constraints have been introduced in literature by Yang and Chen (2000). Basically, these constraints impose a specified starting time on the project activities and force them to be inactive during specified time periods. This type of constraints have been incorporated into...
Persistent link: https://www.econbiz.de/10014105801
Persistent link: https://www.econbiz.de/10012820140
Persistent link: https://www.econbiz.de/10003968471
Persistent link: https://www.econbiz.de/10003923233