Showing 71 - 80 of 244
We consider a generic Markov decision process (MDP) with two controls: one control taking effect immediately and the other control whose effect is delayed by a positive lead time. Computing the optimal policy of this MDP is difficult when the lead time is large. Interestingly, as the lead time...
Persistent link: https://www.econbiz.de/10014094111
Persistent link: https://www.econbiz.de/10015187112
Persistent link: https://www.econbiz.de/10015076797
Persistent link: https://www.econbiz.de/10015076827
Persistent link: https://www.econbiz.de/10015076829
Persistent link: https://www.econbiz.de/10015076840
Persistent link: https://www.econbiz.de/10015076844
Persistent link: https://www.econbiz.de/10015076852
A newsvendor game studies whether players can collaborate on inventory pooling, where the cost allocation is usually analyzed by the notion of core in cooperative game theory. It is known that the core of the newsvendor game is non-empty and one can use duality theory in stochastic programming...
Persistent link: https://www.econbiz.de/10012854371
We consider the economic lot-sizing (ELS) game with general concave ordering cost.In this cooperative game, multiple retailers form a coalition by placing joint orders to asingle supplier in order to reduce ordering cost. When both the inventory holding costand backlogging cost are linear...
Persistent link: https://www.econbiz.de/10012769208