Showing 171 - 180 of 209,650
Persistent link: https://www.econbiz.de/10013173220
Persistent link: https://www.econbiz.de/10013175497
Persistent link: https://www.econbiz.de/10013190405
In order to manage a project, the Critical Path Method(CPM) is used to estimate the duration of projects and their costs. Still, in different situations, these times could vary, so the Program Evaluation Technique(PERT) is designed using three estimated times, Optimistic time estimate, realistic...
Persistent link: https://www.econbiz.de/10014087191
Persistent link: https://www.econbiz.de/10013543311
In this paper, we propose a novel operational law for calculating the credibility distribution of monotone functions of independent regular fuzzy numbers to study the project scheduling problem with partially (or fully) fuzzy activity durations. In this regard, we formulate three corresponding...
Persistent link: https://www.econbiz.de/10014079981
Persistent link: https://www.econbiz.de/10015405934
Persistent link: https://www.econbiz.de/10010465081
Persistent link: https://www.econbiz.de/10010474323
Persistent link: https://www.econbiz.de/10003949681