Showing 141 - 150 of 27,630
Persistent link: https://www.econbiz.de/10010256229
Persistent link: https://www.econbiz.de/10010256680
Persistent link: https://www.econbiz.de/10010194489
Persistent link: https://www.econbiz.de/10010424871
Persistent link: https://www.econbiz.de/10010425024
Persistent link: https://www.econbiz.de/10009575428
Persistent link: https://www.econbiz.de/10009575431
Persistent link: https://www.econbiz.de/10010493578
Persistent link: https://www.econbiz.de/10011969051
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the...
Persistent link: https://www.econbiz.de/10011898585