The paper describes an algorithm for the generation of a general class of precedence- and resource-constrained scheduling problems. Easy and hard instances for the single- and multi-mode resource-constrained project scheduling problem are benchmarked by using the state of the art...
Persistent link: https://www.econbiz.de/10011613720
We consider the resource-constrained project scheduling problem (RCPSP). The focus of the paper is on a formal definition of semi-active, active, and non-delay schedules. Traditionally these schedules establish basic concepts within the job shop scheduling literature. There they are usually...
Persistent link: https://www.econbiz.de/10011613723
We consider the multi-mode resource-constrained project scheduling problem. The focus is on an algorithm which is supposed to find a makespan optimal solution. This algorithm has been presented in a recent paper by Speranza and Vercellis. The correctness of the algorithm is examined. Moreover,...
Persistent link: https://www.econbiz.de/10011613739
We consider the classical resource-constrained project scheduling problem (RCPSP). The paper gives a detailed algorithmic description and provides theoretical results on two widely known problem specific heuristics: The serial and the parallel scheduling scheme. An in-depth computational study...
Persistent link: https://www.econbiz.de/10011613743
Based upon an empirical survey among the 200 biggest CPA firms in Germany an hierarchical modeling framework for audit-staff scheduling with three levels has been developed. For the second level, the so-called medium-to-short-term planning, a binary optimization model is introduced which is...
Persistent link: https://www.econbiz.de/10011613752
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011613753
In der vorliegenden Arbeit werden sieben weit verbreitete PM-Programme auf der Basis eines entscheidungstheoretischen Ansatzes beurteilt. Die verwendete multiattributive Wertfunktion berücksichtigt dabei auch die Ergebnisse einer repräsentativen experimentellen Untersuchung für das...
Persistent link: https://www.econbiz.de/10011613757
EDV-gestütztes Projektmanagement (PM) ist eine weit verbreitete Planungsmethode auf allen Managementebenen. Allein in …