Showing 1 - 10 of 1,023
This paper describes a model that generates weekly movie schedules in a multiplex movie theater. A movie schedule specifies within each day of the week, on which screen(s) different movies will be played, and at which time(s). The model consists of two parts: (i) conditional forecasts of the...
Persistent link: https://www.econbiz.de/10010731544
This paper addresses the Rolling Stock Balancing Problem (RSBP). This problem arises at a passenger railway operator when the rolling stock has to be re-scheduled due to changing circumstances. These problems arise both in the planning process and during operations. The RSBP has as input a...
Persistent link: https://www.econbiz.de/10011122698
In this paper we describe Operations Research (OR) models and techniques that can be used for determining (cyclic) railway timetables. We discuss the two aspects of railway timetabling: ($i$) the determination of arrival and departure times of the trains at the stations and other relevant...
Persistent link: https://www.econbiz.de/10011122699
This paper deals with disruption management in passenger railway transportation. In the disruption management process, many actors belonging to different organizations play a role. In this paper we therefore describe the process itself and the roles of the different actors. Furthermore, we...
Persistent link: https://www.econbiz.de/10011122700
In this paper, we give an overview of state-of-the-art Operations Research models and techniques used in passenger railway transportation. For each planning phase (strategic, tactical and operational), we describe the planning problems arising there and discuss some models and algorithms to...
Persistent link: https://www.econbiz.de/10010731607
In this paper we discuss several methods to solve large real-world instances of the vehicle and crew scheduling problem. Although, there has been an increased attention to integrated approaches for solving such problems in the literature, currently only small or medium-sized instances can be...
Persistent link: https://www.econbiz.de/10010731614
In the Netherlands, relatively large disruptions occur on average about three times per day, each time leading to a temporary and local unavailability of the railway system. Faster response times and better solutions can be expected by the application of algorithmic support in the disruption...
Persistent link: https://www.econbiz.de/10010731630
Express service providers manage shipments from senders to receivers under strict service level agreements. Such shipments are usually not sufficient to justify a single transportation, so it is preferred to maximize consolidation of these shipments to reduce cost. The consolidation is organized...
Persistent link: https://www.econbiz.de/10010731651
Railway operations are disrupted frequently, e.g. the Dutch railway network experiences about three large disruptions per day on average. In such a disrupted situation railway operators need to quickly adjust their resource schedules. Nowadays, the timetable, the rolling stock and the crew...
Persistent link: https://www.econbiz.de/10010731748
Given a set of timetabled tasks, the multi-depot vehicle scheduling problem is a well-known problem that consists of determining least-cost schedules for vehicles assigned to several depots such that each task is accomplished exactly once by a vehicle. In this paper, we propose to compare the...
Persistent link: https://www.econbiz.de/10010731769