Showing 1 - 10 of 1,216
In this study we investigate the desired level of recovery under various inventory control policies when the success of recovery is probabilistic. Recovery process is modelled as a single stage operation and recovery effort is represented by the expected time spent for it. The effect of...
Persistent link: https://www.econbiz.de/10010731627
In this paper we give a complete analysis of the joint replenishment problem (JRP) under constant demands and continuous time. We present a solution method for the JRP when a correction is made for empty replenishments, and we test the solution procedures with real data. We show that the...
Persistent link: https://www.econbiz.de/10010731720
We study the joint replenishment problem (JRP) for M items under deterministic demand, with a minimum order quantity constraint for each item in the replenishment order. We first study an iterative procedure that proves to be not efficient in this case. Further, we derive bounds on the basic...
Persistent link: https://www.econbiz.de/10010731854
In this paper we proposed an efficient algorithm to solve the joint replenishment problem to optimality. We perform a computational study to compare the performance of the proposed algorithm with the best one reported in Viswanathan [6]. The study reveals that for large minor set-up costs and...
Persistent link: https://www.econbiz.de/10010731901
In this paper we present new bounds on the basic cycle time for optimal methods to solve the JRP. They are tighter than the ones reported in Viswanathan [7]. We carry out extensive numerical experiments to compare them and to investigate the computational complexity.
Persistent link: https://www.econbiz.de/10010837982
This paper addresses the Rolling Stock Balancing Problem (RSBP). This problem arises at a passenger railway operator when the rolling stock has to be re-scheduled due to changing circumstances. These problems arise both in the planning process and during operations. The RSBP has as input a...
Persistent link: https://www.econbiz.de/10011122698
Nowadays railway companies are confronted with high infrastructure maintenance costs. Therefore good strategies are needed to carry out these maintenance activities in a most cost effective way. In this paper we solve the preventive maintenance scheduling problem (PMSP) using genetic algorithms,...
Persistent link: https://www.econbiz.de/10010731578
Ports provide a number of logistical choices concerning storage, onward transport, and postponement. We investigate the routing flexibility offered by ports with a central location with respect to the hinterland. This flexibility is investigated using an illustrative case in which a number of...
Persistent link: https://www.econbiz.de/10010731581
This paper investigates the impact of arrival processes on the ship handling process. Two types of arrival processes are considered: controlled and uncontrolled. Simulation results show that uncontrolled arrivals of ships perform worst in terms of both ship delays and required storage capacity....
Persistent link: https://www.econbiz.de/10010731597
This paper examines the algorithms proposed in the literature for finding good critical level policies in the (S-1,S) lost sales inventory model with multiple demand classes. Our main result is that we establish guaranteed optimality for two of these algorithms. This result is extended to...
Persistent link: https://www.econbiz.de/10010731601