Showing 1 - 10 of 65
Inspired by a case study, this paper reports a successful application of VNS to the production planning and scheduling problem that arises in the glass container industry. This is a multi-facility production system, where each facility has a set of furnaces where the glass paste is produced in...
Persistent link: https://www.econbiz.de/10005414152
The classical multi-level capacitated lot-sizing problem formulation is often not suitable to correctly capture resource requirements and precedence relations. Depending on lead time assumptions, either the model provides infeasible production plans or plans with costly needless inventory. We...
Persistent link: https://www.econbiz.de/10011117496
In this paper, we investigate a two-stage lot-sizing and scheduling problem in a spinning industry. A new hybrid method called HOPS (Hamming-Oriented Partition Search), which is a branch-and-bound based procedure that incorporates a fix-and-optimize improvement method is proposed to solve the...
Persistent link: https://www.econbiz.de/10010730169
Several production environments require simultaneous planing of sizing and scheduling of sequences of production lots. Integration of sequencing decisions in lotsizing and scheduling problems has received an increased attention from the research community due to its inherent applicability to...
Persistent link: https://www.econbiz.de/10010906813
This paper presents a successful application of operations research techniques in guiding the decision making process to achieve a superior operational efficiency in core activities. We focus on a rich vehicle routing problem faced by a Portuguese food distribution company on a daily basis. This...
Persistent link: https://www.econbiz.de/10010995403
This study deals with industrial processes that produce soft drink bottles in different flavours and sizes, carried out in two synchronised production stages: liquid preparation and bottling. Four single-stage formulations are proposed to solve the synchronised two-stage lot sizing and...
Persistent link: https://www.econbiz.de/10010572505
Persistent link: https://www.econbiz.de/10008775921
We present a novel mathematical model and a mathematical programming based approach to deliver superior quality solutions for the single machine capacitated lot sizing and scheduling problem with sequence-dependent setup times and costs. The formulation explores the idea of scheduling products...
Persistent link: https://www.econbiz.de/10010679122
Persistent link: https://www.econbiz.de/10009796776
Persistent link: https://www.econbiz.de/10010134115