Hoekstra, Arjen; Kok, Jean-Luc - In: Natural Hazards 47 (2008) 2, pp. 217-228
In the Netherlands the current dike design policy is to design flood defence structures corresponding to an agreed flooding probability with an extra safety board of at least 0.5 m. For river dikes a return period of 1,250 years is used to determine the design water levels. A problem with this...