In the Netherlands the current dike design policy is to design flood defence structures corresponding to an agreed flooding probability with an extra safety board of at least 0.5 m. For river dikes a return period of 1,250 years is used to determine the design water levels. A problem with this...
Persistent link: https://www.econbiz.de/10010995851
The downstream effects of flood risk mitigation measures and the necessity to develop flood risk management strategies that are effective on a basin scale call for a flood risk assessment methodology that can be applied at the scale of a large river. We present an example of a rapid flood risk...