We present an exact branch-and-bound algorithm for the two-stage hybrid flow shop problem with multiple identical machines in each stage. The objective is to schedule a set of jobs so as to minimize the makespan. This is the first exact procedure which has been specifically designed for this...
Persistent link: https://www.econbiz.de/10010847763
Chains of operations have to be scheduled on a single machine such that a minimum delay is set between any two operations linked by a precedence relation. Three sub-problems are shown to be solved in polynomial time. First, we consider the problem of minimizing the makespan when all the...
Persistent link: https://www.econbiz.de/10010847713
Chains of operations have to be scheduled on a single machine such that a minimum delay is set between any two operations linked by a precedence relation. Three sub-problems are shown to be solved in polynomial time. First, we consider the problem of minimizing the makespan when all the...
Persistent link: https://www.econbiz.de/10010950126
We study a batch-scheduling problem of unit-time jobs on a two-stage flexible flowshop. The objective functions are minimum makespan and minimum flowtime. Unlike previously studied models: (i) a general number of machines in both stages of the flowshop is allowed, and (ii) there is no...
Persistent link: https://www.econbiz.de/10011076778
Persistent link: https://www.econbiz.de/10014382356
Persistent link: https://www.econbiz.de/10010382542
Persistent link: https://www.econbiz.de/10010382544
Persistent link: https://www.econbiz.de/10010437989
Persistent link: https://www.econbiz.de/10010845828
A territory design problem motivated by a bottled beverage distribution company is addressed. The problem consists of finding a partition of the entire set of city blocks into a given number of territories subject to several planning criteria. Each unit has three measurable activities associated...
Persistent link: https://www.econbiz.de/10011051842