Showing 71 - 80 of 185
Persistent link: https://www.econbiz.de/10005347181
Persistent link: https://www.econbiz.de/10005347848
Persistent link: https://www.econbiz.de/10005355085
Persistent link: https://www.econbiz.de/10005240883
Persistent link: https://www.econbiz.de/10005257147
Persistent link: https://www.econbiz.de/10005283497
The two management set parameters which determine the performance of a material requirements planning (MRP) system are the lead time and the safety stock. The appropriate values of these parameters are influenced by the accuracy of forecasts over the lead time, the variability of processing time...
Persistent link: https://www.econbiz.de/10009204187
In this paper we consider a class of job shops with a dispatch area and a machine shop, where operational controls are exercised at the dispatch area as well as at the machine shop. For such dynamic job shops with these two levels of control, there are three categories of models. They are (1)...
Persistent link: https://www.econbiz.de/10009204560
In most integrated works, ingots are used as an intermediate form during the production of steel. These ingots, produced by pouring molten steel into molds, are too large to be used as input for the finishing mills which produce steel products. Hence, more manageable forms (blooms, billets and...
Persistent link: https://www.econbiz.de/10009208797
This paper reviews recent work on the development of analytical models of Flexible Manufacturing Systems (FMSs). The contributions of each of the groups concerned with model development are summarized and an assessment is made of the strengths and weaknesses of its modelling approach. A number...
Persistent link: https://www.econbiz.de/10009214230