Showing 1 - 10 of 13
Persistent link: https://www.econbiz.de/10012272522
Abstract Imperfect processes experience fault productions over time due to specific causes. Integrating the statistical process control, maintenance policy, and economic production quantity has led to more favorable results for the imperfect processes in literature. When monitoring a process,...
Persistent link: https://www.econbiz.de/10014591079
In this study, a static single machine scheduling problem is investigated, where processing times are stochastic, due dates are deterministic and inserted idle time is allowed. Two objective functions are simultaneously taken into account, minimization of mean completion time and minimization of...
Persistent link: https://www.econbiz.de/10011241037
Persistent link: https://www.econbiz.de/10014393428
Persistent link: https://www.econbiz.de/10008938543
Persistent link: https://www.econbiz.de/10011406968
Persistent link: https://www.econbiz.de/10011748616
Persistent link: https://www.econbiz.de/10011518380
Persistent link: https://www.econbiz.de/10011592347
Persistent link: https://www.econbiz.de/10013461683