Showing 1 - 10 of 961
In this report we discuss a model that can be used to determine stocking levels using the data that comes forward from a Shell RCM analysis and the data available in E-SPIR. The model is appropriate to determine stock quantities for parts that are used in redundancy situations, and for parts...
Persistent link: https://www.econbiz.de/10005450864
In the classical approach to determine how many spare parts to stock, the spare parts shortage costs or the minimum fill rate are a key factor. A difficulty with this approach lies in the estimation of these shortage costs or the determination of appropriate minimum fill rates. In an attempt to...
Persistent link: https://www.econbiz.de/10008584823
In this paper obsolescence of service parts is analyzed in a practical environment. Based on the analysis, we propose a method that can be used to estimate the risk of obsolescence of service parts. The method distinguishes groups of service parts. For these groups, the risk of obsolescence is...
Persistent link: https://www.econbiz.de/10008584738
In most multi-item inventory systems, the ordering costs consist of a major cost and a minor cost for each item included. Applying for every individual item a cyclic inventory policy, where the cycle length is a multiple of some basic cycle time, reduces the major ordering costs. An efficient...
Persistent link: https://www.econbiz.de/10005209541
In this paper we discuss a general framework for single component replacement models. This framework is based on the regenerative structure of these models and by using results from renewal theory a unified presentation of the discounted and average finite and infinite horizon cost models is...
Persistent link: https://www.econbiz.de/10005209546
A railway system needs a substantial amount of maintenance. To prevent unexpected breakdowns as much as possible, preventive maintenance is required. In this paper we discuss the Preventive Maintenance Scheduling Problem (PMSP), where (short) routine activities and (long) unique projects have to...
Persistent link: https://www.econbiz.de/10005256413
In this article we give an overview of the relation between planning of maintenance and production. On the one hand we consider production planning and scheduling models in which failures and maintenance aspects are taken into account. Next we discuss the planning of maintenance activities, for...
Persistent link: https://www.econbiz.de/10005256414
Persistent link: https://www.econbiz.de/10008490353
The consideration of environmental issues has emerged as a topic of critical importance for today’s globalized supply chains. The purpose of this paper is to develop a strategic-tactical decision-support methodology to assist managers in evaluating the impact of environmental issues,...
Persistent link: https://www.econbiz.de/10008490354
Most maintenance-optimisation models assume an infinite planning horizon and suppose that the failure process is stationary. Hence, information which is not known beforehand and which becomes available on the short term only, must be ignored. We consider in this paper a multi-component system...
Persistent link: https://www.econbiz.de/10004972180