Showing 1 - 5 of 5
In this paper a discrete-continuous project scheduling problem is considered. In this problem activities simultaneously require discrete and continuous resources. The processing rate of each activity depends on the amount of the continuous resource allotted to this activity at a time. All the...
Persistent link: https://www.econbiz.de/10010999772
Persistent link: https://www.econbiz.de/10008214684
Persistent link: https://www.econbiz.de/10013520620
This paper surveys single-project, single-objective, deterministic project scheduling problems in which activities can be processed using a finite or infinite (and uncountable) number of modes concerning resources of various categories and types. The survey is based on a unified framework of a...
Persistent link: https://www.econbiz.de/10008865133
In this paper a discrete-continuous project scheduling problem is considered. In this problem activities simultaneously require discrete and continuous resources. The processing rate of each activity depends on the amount of the continuous resource allotted to this activity at a time. All the...
Persistent link: https://www.econbiz.de/10010759370