We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially renewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make,...
Persistent link: https://www.econbiz.de/10009191542
This paper addresses the towing process of airplanes as part of the turnaround process. We introduce a VRP based MIP model which assigns different types of towing tractors to jobs with specified service time windows. The objective function minimizes operating costs subject to operational...
Persistent link: https://www.econbiz.de/10010931059
Persistent link: https://www.econbiz.de/10011558740
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially reiiewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make...
Persistent link: https://www.econbiz.de/10011799792
Persistent link: https://www.econbiz.de/10000682119
Persistent link: https://www.econbiz.de/10011545047
Persistent link: https://www.econbiz.de/10011410756
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially reiiewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make...
Persistent link: https://www.econbiz.de/10011808900
Persistent link: https://www.econbiz.de/10010433349
Persistent link: https://www.econbiz.de/10010238222